Blog

Gayrol Taylor
November 17, 2020
No Comments

Factory Equipment Layout

This AutoCAD design was done to solve an installation problem where some tanks were to be installed with a crane. A structure was needed to support the crane as well as to allow for the stocking of pallets on the loading platform for the crane to reach and hoist into the tanks. All elements were designed from scratch.

Comment

2 − two =